Home Acima Company Info Technical Staff Main Clients Activities

Tunnels
Foundation Tunnels Dams & Hidroelectric Geo-environmental Slopes

 

Metro SP
Tarija - Bermejo

Tunnels

bulletLine 2 Metro São Paulo – Basic and Final Design of lot 2 (~1500 m of tunnels)
bulletLine 4 Metro São Paulo – consultancy for the optimization of Stations and Tunnels
bulletRio de Janeiro Metro – consultancy and site inspections
bulletSalvador Metro – Basic and Final Geotechnical Design of a 800 m long stretch; consultancy and site inspections of the existing stretch
bulletCarretera Tarija Bermejo – Basic and Final Design of 4 road tunnels (total length approx. 1500 m)
 

[Voltar] [Home] [Acima] [Avançar]